Mitsubishi GOT1000 Series Connection Manual page 665

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

CONNECTION TO
SIEMENS PLC
18.1 System Configuration . . . . . . . . . page 18-2
This section describes the equipment and cables needed
when connecting a GOT to a SIEMENS PLC.
Select a system suitable for your application.
18.2 Connection Cable . . . . . . . . . . . . page 18-5
This section describes the specifications of the cables
needed when connecting a GOT to a SIEMENS PLC.
Check the specifications of the connection cables.
18.3 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . page 18-7
This section provides the procedures to be followed before
performing monitoring in connection to a SIEMENS PLC.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
18.5 Precautions . . . . . . . . . . . . . . . . page 18-22
This section describes the precautions to observe when a
GOT is connected to a SIEMENS PLC.
Be sure to read this section when connecting the GOT to a
SIEMENS PLC.
18
18 - 1
17
18
19
20
21
22
23
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents