10.3 Preparatory Procedures for Monitoring

The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Confirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 10.4 PLC Side Setting
Section 10.3.1
Installing OS onto GOT
Section 10.3.2
Checking OS installation on GOT
Section 10.3.3
Setting communication interface
(Communication settings)
Section 10.3.4
Downloading project data
Section 10.3.5
Attaching communication unit and
connecting cable
Section 10.3.6
Verifying GOT recognizes connected
equipment
Section 10.3.7
Checking for normal monitoring
10.3 Preparatory Procedures for Monitoring