(4) Condition setting switches
Condition setting switches
6 - 10
6.2 Preparatory Procedures for Monitoring
6.2.3 Setting communication interface (Communication settings)
Setting switch
SW1
SW2
(1) Switch setting example
For the switch setting example, refer to the following.
Section 6.3 PLC Side Setting
(2) When the switch setting is changed
When changing the switch setting after mounting the MELSECNET/10
communication unit to the GOT, reset the GOT.
Description
Specify input data status of the data link error station.
<Default: OFF>
Specify the number of stations occupied.
<Default: OFF>
Setting
OFF: Cleared
ON: Held
OFF: 1 station
ON: 4 stations