Mitsubishi GOT1000 Series Connection Manual page 957

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

23.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Confirming the inverter side setting
This section explains the GOT side setting.
When confirming the inverter side setting, refer to the following.
Section 23.4 FREQROL Series Inverter Side Settings
Section 23.3.1
Installing OS onto GOT
Section 23.3.2
Checking OS installation on GOT
Section 23.3.3
Setting communication interface
(Communication settings)
Section 23.3.4
Downloading project data
Section 23.3.5
Attaching communication unit and
connecting cable
Section 23.3.6
Verifying GOT recognizes connected
equipment
Section 23.3.7
Checking for normal monitoring
23.3 Preparatory Procedures for Monitoring
17
18
19
20
21
22
23
24
23 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents