24.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
24 - 14
24.3 Preparatory Procedures for Monitoring
Comfirming the servo amplifier side setting
This section explains the GOT side setting.
When confirming the servo amplifier side setting, refer to the following.
Section 24.4 Setting on Servo Amplifier Side
Section 24.3.1
Installing OS onto GOT
Section 24.3.2
Checking OS installation on GOT
Section 24.3.3
Setting communication interface
(Communication settings)
Section 24.3.4
Downloading project data
Section 24.3.5
Attaching communication unit and
connecting cable
Section 24.3.6
Verifying GOT recognizes connected
equipment
Section 24.3.7
Checking for normal monitoring