Mitsubishi GOT1000 Series Connection Manual page 505

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

CONNECTION TO
HITACHI PLC
13.1 System Configuration . . . . . . . . . page 13-2
This section describes equipment and cables needed when
connecting a GOT to a HITACHI PLC.
Select a system suitable for your application.
13.2 Connection Cable . . . . . . . . . . . . page 13-6
This section describes the specifications of the cables
needed when connecting a GOT to a HITACHI PLC.
Check the specifications of the connection cables.
13.3 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . page 13-11
This section provides the procedures to be followed before
performing monitoring in connection to a HITACHI PLC.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
13.4 PLC Side Setting . . . . . . . . . . . . page 13-26
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
13.5 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . page 13-28
This section describes the functions added by version
upgrade of GT Designer2 or OS.
13
13 - 1
9
10
11
12
13
14
15
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents