Mitsubishi GOT1000 Series Connection Manual page 281

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

CC-Link
CONNECTION
(Via G4)
7.1 System Configuration . . . . . . . . . . page 7-2
This section describes the equipment and cables needed
for CC-Link connection (via G4).
Select a system suitable for your application.
7.2 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . page 7-5
This section describes the procedures to be followed
before monitoring in CC-Link connection (via G4).
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
7.3 PLC Side Settings . . . . . . . . . . . . page 7-18
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
7.4 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . . page 7-23
This section describes the functions added by version
upgrade of GT Designer2 or OS.
7
1
2
3
4
5
6
7
8
7 - 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents