Preparatory Procedures For Monitoring - Mitsubishi GOT1000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

28.3 Preparatory Procedures for Monitoring

The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
28 - 4
28.3 Preparatory Procedures for Monitoring
Section 28.3.1
Installing OS onto GOT
Section 28.3.2
Checking OS installation on GOT
Section 28.3.3
Setting communication interface (Communication
settings)
Section 28.3.4
Downloading project data
Section 28.3.5
Attaching option function borad/communication
unit and connecting cable
Section 28.3.6
Verifying GOT recognizes connected equipments
Section 28.3.7
Checking for normal monitoring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents