Mitsubishi GOT1000 Series Connection Manual page 264

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

3
Parameter setting
There are two methods for the parameter setting: perform the setting from [Network parameter] of GX
Developer and the sequence program.
Performing it from the [Network parameter] of the GX Developer can be set only when the PLC CPU
and the CC-Link module use the function version B or later.
(1) Setting from [Network parameter] of GX Developer
(a) Network parameter
No. of boards in module
Start I/O No.
Type
All connect count
Remote input (RX)
Remote output (RY)
Remote register (RWr)
Remote register (RWw)
Special relay (SB)
Special register (SW)
Retry count
Automatic reconnection station count
Wait master station No.
PLC down select
Scan mode setting
Delay information setting
Station information setting
6 - 28
6.3 PLC Side Setting
6.3.2 Connecting to CC-Link module (QnA Series)
Item
Setting
1
0000
H
Master station (fixed)
1
X400
Y400
D300
D200
B0
W0
(Use default value.)
Refer to (2).
: Necessary
Setting necessity at GOT
connection
: As necessary
: Not necessary

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents