Station No. Settings - Mitsubishi GOT1000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

20.4.4 Station NO. settings

Set each station number while making sure that one station number is used only once.
The station number can be set without regard to the cable connection order. No problem is expected even if
station numbers are not consecutive.
GOT
(1) Direct specification
When setting the device, specify the station number of the temperature controller of which data is
to be changed.
E5AN, E5EN, E5CN, E5GN
E5ZN
(2) Indirect specification
When setting the device, indirectly specify the station number of the inverter of which data is to be
changed using the 16-bit GOT internal data register (GD10 to GD25).
When specifying the station No. from 100 to 155 on GT Designer2, the value of GD10 to GD25
compatible to the station No. specification will be the station No. of the temperature controller.
Å@
Specification
station NO.
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
(3) All station specification
Target station differs depending on write-in operation or read-out operation.
• For write-in operation, all station will be a target.
• For read-out operation, only one station will be a target.
Station No.3
Station No.0
Examples of station number setting
Specification
Model
range
0 to 99
0 to 15
Compatible
device
GD10
GD11
GD12
GD13
GD14
GD15
GD16
0 to 99: For E5AN, E5EN, E5CN or E5GN
GD17
0 to 15: For E5ZN
For the setting other than the above, communication timeout error will
GD18
occur.
GD19
GD20
GD21
GD22
GD23
GD24
GD25
Station No.1
Station No.15
Setting range
20.4 Temperature Controller Side Setting
20.4.4 Station NO. settings
Station No.6
20 - 31
17
18
19
20
21
22
23
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents