4
19.6 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface.
(Communication settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Section 19.6.1
Installing OS onto GOT
Section 19.6.2
Checking OS installation on GOT
Section 19.6.3
Setting communication interface
(Communication settings)
Section 19.6.4
Downloading project data
Section 19.6.5
Attaching communication unit and
connecting cable
Section 19.6.6
Verifying GOT recognizes connected
equipment
Section 19.6.7
Checking for normal monitoring
19.6 Preparatory Procedures for Monitoring
17
18
19
20
21
22
23
24
19 - 73