Preparatory Procedures For Monitoring - Mitsubishi GOT1000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

14.3 Preparatory Procedures for Monitoring

The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Comfirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 14.4 PLC Side Setting
Section 14.3.1
Installing OS onto GOT
Section 14.3.2
Checking OS installation on GOT
Section 14.3.3
Setting communication interface
(Communication settings)
Section 14.3.4
Downloading project data
Section 14.3.5
Attaching communication unit and
connecting cable
Section 14.3.6
Verifying GOT recognizes connected
equipment
Section 14.3.7
Checking for normal monitoring
14.3 Preparatory Procedures for Monitoring
9
10
11
12
13
14
15
16
14 - 23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents