Mitsubishi GOT1000 Series Connection Manual page 302

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

(2) Station information setting
Station type
Exclusive station count
Reserve/invalid station select
Intelligent buffer select (word)
*1
*2
When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)] or [Remote net - Additional mode],
(3) Completion confirmation
After initial communications of CC-Link are completed, the L RUN LED of AJ65BT-G4-S3 turns on.
The GOT starts to monitor after the L-RUN LED of AJ65BT-G4-S3 turns on.
It does not monitor while the L RUN LED turns off.
PW
RUN
L RUN
SD
RD
L ERR.
5
[Communication settings] of GT Designer2
7 - 22
7.3 PLC Side Settings
*1
Item
*2
When the [Mode] of the CC-Link module is set at [Remote net - (Ver. 2 mode)], [Remote station points] is
available to set.
[Remote station points] is a setting for the remote I/O station.
The default value (32 points) must be used on the GOT.
set to [Ver. 1 Intelligent device station].
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether
turning OFF and then ON or resetting.
Item
Transmisstion Speed
[Communication Settings] of GT Designer2
For the setting method of [Communication Settings] of GT Designer2, refer to the
following.
Section 7.2.3 Setting communication interface (Communication settings)
Setting
Intelligent device station (fixed)
Exclusive station 1 (fixed)
No setting
(Use default value.)
: Necessary
Setting (Use default value.)
Setting necessity at GOT
connection
: As necessary
: Not necessary
9600bps

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents