CONNECTION TO
TOSHIBA PLC
12.1 System Configuration . . . . . . . . . page 12-2
This section describes the equipment and cables needed
when connecting a GOT to a TOSHIBA PLC.
Select a system suitable for your application.
12.2 Connection Cable . . . . . . . . . . . . page 12-7
This section describes the specifications of the cables
needed when connecting a GOT to a TOSHIBA PLC.
Check the specifications of the connection cables.
12.3 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . page 12-12
This section provides the procedures to be followed before
performing monitoring in connection to a TOSHIBA PLC.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
12.4 PLC Side Setting . . . . . . . . . . . . page 12-26
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
12.5 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . page 12-28
This section describes the functions added by version
upgrade of GT Designer2 or OS.