Mitsubishi GOT1000 Series Connection Manual page 274

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

6 - 38
6.3 PLC Side Setting
6.3.3 Connecting to CC-Link module (A Series)
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether
turning OFF and then ON or resetting.
Head No. of RX (RX0)
RX refresh destination (X)
RX refresh destination
device head No. (400)
No. of refresh points (32)
RY head number (RY0)
RY refresh destination (Y)
RY refresh destination
device head No. (400)
No. of refresh points (32)
RW head No. (RW0)
RW refresh destination (D)
RW refresh destination
device head No. (200)
No. of refresh points (260)
SB head No. (SB0)
SB refresh destination (B)
SB refresh destination
device head number (0)
No. of refresh points (512)
SW head number (SW0)
SW refresh destination (W)
SW refresh destination
device head No. (0)
No. of refresh points (512)
Dedicated instruction
(RRPA)
CC-Link module head
I/O No. (0000
)
H
Parameter storage head
device (D100)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents