Checking if the GOT is correctly performed the data link
Use [Monitoring other station] of the GX Developer to check if the GOT is correctly performed the data
link.
For the GX Developer operation method, refer to the following manual.
(1) Checking the [Status] (The display example on the GX Developer Version 8)
Startup procedure
GX Developer
All settings related to communications are complete now.
Create screens on GT Designer2 and download the project data again.
6 - 18
6.2 Preparatory Procedures for Monitoring
6.2.7 Checking for normal monitoring
CC-Link System Master/Local Module User's Manual QJ61BT11N
[Diagnostics]
[CC-Link / CC-Link/LT diagnostics]
Monitoring other station