Mitsubishi GOT1000 Series Connection Manual page 215

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

4
Checking if the GOT is performed the data link correctly
Check if the GOT is performed the data link correctly in [Other station info.].
For the GX Developer operation method, refer to the following manual.
Q corresponding MELSECNET/H Network System Reference Manual (PLC to PLC
network)
(1) Check [Communication status of each station] and [Data-Link status of each station]. (The display
example on GX Developer Version 8)
Startup procedure
GX Developer
All settings related to communications are complete now.
Create screens on GT Designer2 and download the project data again.
[Diagnostics]
[MELSECNET (II)/10/H diagnostics]
5.2 Preparatory Procedures for Monitoring
5.2.7 Checking for normal monitoring
1
2
Other station info.
3
4
5
6
7
8
5 - 23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents