27.3.2 Preparatory Procedures for Monitoring

The following the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface.
(Communication settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
27 - 44
27.3 CC-Link Connection (Intelligent Device Station)
27.3.2 Preparatory Procedures for Monitoring
Confirming the CNC side setting
This section explains the GOT side setting.
When confirming the CNC side setting, refer to the following.
Section 27.3.10 CNC Side Settings
Section 27.3.3
Installing OS onto GOT
Section 27.3.4
Checking OS installation on GOT
Section 27.3.5
Setting communication interface
(Communication settings)
Section 27.3.6
Downloading project data
Section 27.3.7
Attaching communication unit and
connecting cable
Section 27.3.8
Verifying GOT recognizes connected
equipment
Section 27.3.9
Checking for normal monitoring

Hide quick links: