Mitsubishi GOT1000 Series Connection Manual page 336

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

3
Sequence program
The sequence program for initial processing and communication line opening processing are required.
(1) Programming condition
This program performs the initial processing of the Ethernet module and the opening processing of
connection No. 1 when the stopping PLC CPU starts running.
(a) I/O signal of Ethernet module
(b) Device used by user
D112 to D113
8 - 32
8.3 PLC Side Setting
8.3.3 Connecting to Ethernet module (A Series)
For A Ethernet Interface Module User's Manual
Device
M102
COM.ERR turned off command
D100
IP address of Ethernet module
D110
Application setting
D111
Port No. of Ethernet module
IP address of GOT
D114
Port No. of GOT
D200
Initial fault code
Application

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents