Mitsubishi GOT1000 Series Connection Manual page 1095

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

2
Connecting the cable
Always ground the FG terminal of the GOT power supply and the FG1 terminal of this unit to the
protective ground conductor.
Be sure to ground the GOT and this unit separately.
Failure to do so may cause an electric shock or malfunctions.
Use applicable solderless terminals and tighten them with the specified torque.
If any solderless spade terminal is used, it may be disconnected when the terminal screw comes
loose, resulting in failure.
Be sure to tighten any unused terminal screws with a torque of 0.36 to 0.48N•m.
Failure to do so may cause a short circuit due to contact with a solderless terminal.
(1) CC-Link dedicated cable connection method
(1) Wiring diagram
<Wiring diagram>
CNC expansion unit
(FUC6-HR865)
Terminating
resistor*
1
*1
When CNC is a terminal station, connect a terminating resistor to the CNC.
CAUTION
(Blue)
DA
(White)
DB
(Yellow)
DG
CC-Link dedicated cable
SLD
FG
27.3 CC-Link Connection (Intelligent Device Station)
27.3.7 Attaching communication unit and connecting cable
1
Connect the CC-Link cable to the terminal block
of the CC-Link communication unit.
If the CC-Link communication unit is terminal
station of the network, be sure to connect a
terminating resistor (packed together with the
CC-Link module) to the terminal block.
GOT (Terminating station)
GOT
DA
DB
DG
CC-Link dedicated cable
SLD
FG1
25
26
27
28
29
30
DA
Terminating
resistor
DB
DG
SLD
FG1
31
27 - 53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents