17.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Setting the communication interface (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
17 - 10
17.3 Preparatory Procedures for Monitoring
Comfirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 17.4 PLC Side Setting
Section 17.3.1
Installing OS onto the GOT
Section 17.3.2
Checking OS installation on GOT
Section 17.3.3
Setting communication interface
(Communication settings)
Section 17.3.4
Downloading project data
Section 17.3.5
Attaching communication unit and
connecting cable
Section 17.3.6
Verifying GOT recognizes connected
equipment
Section 17.3.7
Checking for normal monitoring