9.3 Preparatory Procedures for Monitoring

The following the procedures to be taken before monitoring and corresponding reference sections.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface.
(Communication settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
Comfirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 9.4 PLC Side Setting
Section 9.3.1
Installing OS onto GOT
Section 9.3.2
Checking OS installation on GOT
Section 9.3.3
Setting communication interface
(Communication settings)
Section 9.3.4
Downloading project data
Section 9.3.5
Attaching communication unit and
connecting cable
Section 9.3.6
Verifying GOT recognizes connected
equipment
Section 9.3.7
Checking for normal monitoring
9.3 Preparatory Procedures for Monitoring