Mitsubishi GOT1000 Series Connection Manual page 272

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

3
Sequence program
The parameter setting and the sequence program of the data link startup request is required.
(1) Programming condition (with CC-Link dedicated instructions)
The program sets the network parameter and automatic refresh parameter when PLC CPU status
changes from STOP to RUN, and automatically starts the data link with CC-Link dedicated
instructions.
(a) I/O signal of CC-Link module
(b) Devices used by user
D100 to D103
D104 to D107
D108 to D111
D112 to D115
D116 to D119
6 - 36
6.3 PLC Side Setting
6.3.3 Connecting to CC-Link module (A Series)
Control & Communication Link System Master/Local Module Type AJ61BT11/
A1SJ61BT11 User's Manual
Device
M0
RLPA instruction normal completion flag
M1
RLPA instruction error completion flag
M100
Network parameter setting flag
M101
Automatic refresh parameter setting flag
D0
Synchronous mode valid/invalid
D1
Number of connected modules
D2
Station data
D3
Send buffer size
D4
Receive buffer size
D5
Automatic update buffer size
D400
Error code in the case of error completion of RLPA instruction
Automatic refresh setting (RX)
Automatic refresh setting (RY)
Automatic refresh setting (RW)
Automatic refresh setting (SB)
Automatic refresh setting (SW)
Application

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents