Mitsubishi GOT1000 Series Connection Manual page 1012

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

25.2 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Connect the GOT to the PLC.
Install the OS onto the GOT.
Make sure that the OS is installed on the GOT.
Set the communication interface. (Communication
settings)
Download the project data.
Attach the communication unit and connect the cable.
Make sure that the GOT recognizes the connected
equipment.
Make sure that monitoring is performed normally.
25 - 4
25.2 Preparatory Procedures for Monitoring
On system configuration example
This section describes GOT side settings.
For system configuration examples of bar code reader connection, refer to the
following.
Section 25.4 System Configuration Examples
Refer to each chapter.
Section 25.2.1
Installing OS onto GOT
Section 25.2.2
Checking OS installation on GOT
Section 25.2.3
Setting communication interface
(Communication settings)
Section 25.2.4
Downloading project data
Section 25.2.5
Attaching communication unit and
connecting cable
Section 25.2.6
Verifying GOT recognizes connected
equipment
Section 25.2.7
Checking for normal monitoring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents