Mitsubishi GOT1000 Series Connection Manual page 1001

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

2
Perform an I/O check
Whether the servo amplifier can communicate with the GOT or not can be checked by the I/O check
function.
If this check ends successfully, it means correct communication interface settings and proper cable
connection.
Display the I/O check screen by [Main Menu]
For details on the I/O check, refer to the following manual:
GT
User's Manual
3
Confirming the servo amplifier side setting
When connecting the GOT, setting is required for the servo amplifier side.
Confirm if the servo amplifier side setting is correct.
Section 24.4 Setting on Servo Amplifier Side
All settings related to communications are complete now.
Create screens on GT Designer2 and download the project data again.
[Debug & self check]
1
Touch [CPU] on the I/O check screen.
Touching [CPU] executes the
communication check with the
connected servo amplifier.
2
When the communication screen
ends successfully, the screen on the
left is displayed.
24.3 Preparatory Procedures for Monitoring
24.3.7 Checking for normal monitoring
[Self check]
[I/O check].
24 - 27
17
18
19
20
21
22
23
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents