Mitsubishi GOT1000 Series Connection Manual page 1099

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

4
Checking if the GOT is correctly performed the data link
Use [Monitoring other station] of the GX Developer to check if the GOT is correctly performed the data
link.
For the GX Developer operation method, refer to the following manual.
CC-Link System Master/Local Module User's Manual QJ61BT11N
(1) Checking the [Status] (The display example on the GX Developer Version 8)
Startup procedure
GX Developer
All settings related to communications are complete now.
Create screens on GT Designer2 and download the project data again.
[Diagnostics]
[CC-Link / CC-Link/LT diagnostics]
27.3 CC-Link Connection (Intelligent Device Station)
27.3.9 Checking for normal monitoring
Monitoring other station
27 - 57