Site Selection For The Base Station - Siemens Hicom 150 E Office Service Manual

Hide thumbs Also See for Hicom 150 E Office:
Table of Contents

Advertisement

Hicom 150 E Office Rel.1.0 Service Manual - 12 Cordless Multicell Integration CMI
Connection
handover:
The call is terminated while
attempting to change to another BS.

12.8 Site selection for the base station

In order to identify the best sites for the base stations, a basic radio coverage test should be
carried out (in accordance with the information in the manual "Hicom cordless -
presentation/measurement equipment" (see
information can only provide a basic knowledge and cannot take the place of a radio
coverage test.
General
Propagation conditions for radio traffic
in the free field
in industrial areas
indoors
indoors
Base station:
Where must base stations NOT be installed?
Wo should base stations be installed?
Indoors
http://cmweb01.mch.pn.siemens.de/e_doku/en/h150/h15/30/sh/2/15_12.htm (22 of 45) [06/04/2000 13:05:56]
with visibility
with reinforced concrete buildings and/or metal facades
brick and lightweight materials,
attenuation values (dB) and range loss (%) in
reinforced concrete buildings with a variety of interiors,
attenuation values (dB) and range loss (%) in
Wave propagation
Switch on range warning tone.
Check whether or not the BS to which the call is
handed over is in overload status (all radio channels
busy).
Check the BS.
Check the overlap sectors.
Is the radio quality RSSI value of the other BS okay (at
least 90) (see
page
12-31).
Check the cable length differences between base
stations and Hicom 150 E OfficePro system (see
12-51).
Check the cable cross section/paths of the a/b lines
from MDFU to the base station (see
List of
documentation)). The following
Outdoors
page
Table 12-3
Table 12-4
page
12-50, range).

Advertisement

Table of Contents
loading

Table of Contents