Connection To Plc Cpu (Ethernet Connection); Connecting The Cable - Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

4.4 Connection to PLC CPU (Ethernet connection)

4.4.1

Connecting the cable

This section explains connection procedures for connecting the GOT and PLC CPU with the Ethernet connection cable.
4 - 28
4. From GOT screen creation up to the test
4.4 Connection to PLC CPU (Ethernet connection)
1.
Power OFF the PLC CPU and GOT.
2.
Connect the Ethernet connection cable to the
PLC module.
3.
Connect the Ethernet connection cable to the
GOT.

Advertisement

Table of Contents
loading

Table of Contents