Preparing Required Devices; Devices Required To Operate The Got - Mitsubishi Electric GOT2000 Series Quick Start Manual

Mitsubishi graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

PREPARING REQUIRED DEVICES

PREPARING REQUIRED DEVICES

DEVICES REQUIRED TO OPERATE THE GOT

1
To operate the GOT, the GOT (
(
) are required.
4
GOT
1
GOT2000 (GT27)
For how to install the screen design software, refer to the following.
• GT Works3 Installation Instructions BCN-P5999-0066/0071
For the connecting method of the GOT and a controller, refer to the following.
• GOT2000 Series Connection Manual (Mitsubishi Products) For GT Works3 Version1 SH-081197ENG
9
PREPARING REQUIRED DEVICES
), cables (
), a personal computer and software (
1
2
Cable
2
USB cable
(GT09-C30USB-5P)
Ethernet cable
Personal computer and software
3
Personal
computer
MODEL SW1DND-GTWK3-J
COPYRIGHT(C)2009
MITSUBISHI ELECTRIC CORPORATION
ALL RIGHTS RESERVED
GT Designer3 (GOT2000)
GT Designer3 (GOT2000) Help
Controller
4
PLC
(QnUDV series)
* Built-in Ethernet type
), and a controller
3
GX Works2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents