Test Operation - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■5. Test operation
The following lists the devices for which the test operation can be performed.
(1) Bit device
○: Available, ×: Not available
Device
Input (X)
Output (Y)
Internal relay
(M)
Latch relay (L)
Annunciator (F)
Link relay (B)
Special relay
(SM)
Special relay for
link (SB)
GOT bit register
(GB)
*1
3 - 12
3.2 Specifications
C
controll
Safety
er
CPU
module
(MELS
MELSE
RCPU
(MELS
EC iQ-
C iQ-F
EC iQ-
R
R
Series)
Series)
×
×
×
×
×
×
×
×
×
×
×
×
The test operation can be performed when Q24DHCCPU-V or Q24DHCCPU-VG is connected.
C
Control
QCPU
ler
QnA
(Q
LCPU
module
CPU
mode)
(Q
Series)
×
×
*1
×
×
Robot controller
Motion
CNC
controll
C70,
QSCP
er CPU
MELD
CRnQ-
U
(Q
AS C6/
700
series)
C64
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
FXCPU
CRnD-
700
×
×
×
×
×
×
×
×
×
×
×

Advertisement

Table of Contents
loading

Table of Contents