Screen Creation; Project Creation - Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

4.2 Screen creation

4.2.1

Project creation

Projects comprise all the data and settings displayed in one GOT.
The screens displayed in the GOT and connection method with the PLC are set in a project wizard.
In this section, the settings for the type of GOT used for training and the type of PLC connected to the GOT are
described.
4 - 2
4. From GOT screen creation up to the test
4.2 Screen creation
1.
Click [Start] → [All Programs] → [MELSOFT
Application] → [GT Works3] → [GT
Designer3] menus to run GT Designer3
(GOT2000).
2.
The screen on the left is displayed when GT
Designer3 (GOT2000) is started.
2.
Click the
3.
The initial screen of [New Project Wizard] is
displayed. (When no new wizard appears, go
to section 4.2.2.)
Click the
Various settings that can be made on the
project wizard are described on the following
3.
pages.
button.
button.

Advertisement

Table of Contents
loading

Table of Contents