Toyota Tundra 2005 Service - Repair - Maintenance page 2196

Hide thumbs Also See for Tundra 2005:
Table of Contents

Advertisement

CHARGING (1GR−FE)
INSTALLATION
1.
INSTALL GENERATOR
(a)
Install the generator with the 2 bolts.
Torque: 43 N m (438 kgf cm, 32 ft lbf)
B17626
(b)
Install the wire harness clamp bracket with the 2 bolts.
Torque: 8.0 N m (82 kgf cm, 71 in. lbf)
B17625
(c)
Connect the wire harness.
(1)
Torque: 9.8 N m (100 kgf cm, 7 ft lbf)
(2)
(3)
Torque: 8.0 N m (82 kgf cm, 71 in. lbf)
2.
INSTALL BATTERY
3.
INSTALL FAN AND GENERATOR V BELT
B17624
(See page EM−89)
4.
INSTALL ENGINE UNDER COVER SUB−ASSY NO.1
Install the engine under cover sub−assy No. 1 with the 4 bolts.
Torque: 29 N m (296 kgf cm, 21 ft lbf)
5.
INSTALL V−BANK COVER
Install the V−bank cover with the 2 nuts.
Torque: 9.8 N m (100 kgf cm, 87 in. lbf)
GENERATOR
Connect the wire harness to the terminal B and
install the nut.
Connect the connector to the generator assy.
Install the wire harness stay with the bolt.
CH−15
CH0NC−01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tundra 2006

Table of Contents