SF−48
INSTALLATION
1.
INSTALL CAMSHAFT TIMING OIL CONTROL VALVE
(a)
Install the 2 camshaft timing oil control valves to each cylinder head, and tighten the 2 bolts.
Torque: 9.0 N·m (92 kgf·cm, 80 in.·lbf)
(b)
Connect the 2 oil control valve connectors.
2.
INSTALL FUEL DELIVERY PIPE
3.
INSTALL INTAKE AIR SURGE TANK (See page EM−89)
4.
INSTALL AIR CLEANER (See page EM−89)
5.
INSTALL V−BANK COVER
SFI (1GR−FE)
−
CAMSHAFT TIMING OIL CONTROL VALVE
SF1YZ−01