SF−42
SFI (1GR−FE)
−
THROTTLE BODY
INSTALLATION
1.
INSTALL THROTTLE BODY
(a)
Install a new gasket and the throttle body w/ motor with
the 4 bolts.
Torque: 11 N m (112 kgf cm, 9 ft lbf)
(b)
Connect the throttle motor connector.
A23224
2.
CONNECT WATER BY−PASS HOSE NO.4
A23097
3.
CONNECT WATER BY−PASS HOSE NO.5
4.
INSTALL AIR CLEANER (See page EM−89)
5.
INSTALL V−BANK COVER
6.
ADD ENGINE COOLANT
7.
CHECK FOR ENGINE COOLANT LEAKS
A23096
SF1YU−01