Finishing Work - Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual

Hide thumbs Also See for 125 MAX DD2 evo:
Table of Contents

Advertisement

BRP-Rotax
INSTALLATION MANUAL
Chapter: 7

FINISHING WORK

TOPICS IN THIS CHAPTER
Check oil level in gearbox........................................................................................................................2
Venting of the gear compartment ............................................................................................................4
NOTE
To determine the best possible transmission ratio, the use of a rev-counter is required for observation
of the speed limits.
NOTE
To warrant engine operation within temperature limits of the coolant, a temperature sensor for
observation of the coolant temperature is required.
NOTE
Refer to Operators Manual for operating limits.
7
Effectivity: 125 MAX DD2 evo
Page 1
Edition: September 01 2019

Advertisement

Table of Contents
loading

Table of Contents