Calibration
THRU Response Calibration (transmission test)
Step 8. Press
Step 9. If an isolation calibration must be performed using a LOAD standard, follow the procedure
below.
a. Connect a LOAD standard to each of the two test ports (connectors to which the DUT
is to be connected) selected in Step 6.
Figure 4-10
Connecting the LOAD standard
b. Press
Step 10. Press
process. Upon pressing this key, calibration coefficients will be calculated and saved. The
error correction function will also be automatically enabled.
112
to start the calibration measurement.
Thru
to start the calibration measurement.
Isolation (Optional)
to terminate the response calibration (and the LOAD isolation calibration)
Done
Chapter 4