Step 8. Press
Open
Step 9. If an isolation calibration must be performed using a LOAD standard, follow the procedure
below.
a. Connect a LOAD standard to the test port (connector to which the DUT is to be
connected) selected in Step 6.
Figure 4-6
Connecting the LOAD standard
b. Press
Step 10. Press
Done
process. Upon pressing this key, calibration coefficients will be calculated and saved. The
error correction function will also be automatically enabled.
Chapter 4
OPEN/SHORT Response Calibration (reflection test)
or
to start the calibration measurement.
Short
to start the measurement on the LOAD standard.
Load (Optional)
to terminate the response calibration (and the LOAD isolation calibration)
Calibration
109