Manitowoc Grove GMK6300L Operating Manual page 344

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

Driving modes
6.6 Installing/removing the supporting box
Front outrigger
Auxiliary supports
6 - 72
Extend the auxiliary supports on both sides until the truck crane is aligned
horizontally and no wheel is touching the ground.
At the front outrigger, set the span to 8.50 m
à
(26.1 ft);
p. 12 - 32.
Extend the support cylinders until they
make contact with the ground.
Extend
(A) – Left auxiliary support – Press and hold
down the button (1) below.
Press in the button (3) at the left.
(B) – Right auxiliary support – Press and hold
down the button (2) below.
Press in the button (3) at the left.
Extend the auxiliary supports until the out-
rigger pads make contact with the ground.
3 112 xxx en
Setting the outrigger spans ,
Operating Manual GMK6300L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF