Manitowoc Grove GMK6300L Operating Manual page 233

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

When stationary
for more than
8 hours
H
Operating Manual GMK6300L
Additional chocks can be transported in the storage compartment on the
turntable or at the rear of the truck crane.
Switch off all current consumers, e.g. auxiliary heaters.
Switch off the engine.
In order to prevent malfunctions, you should switch the battery master
switch off only when the engine has been switched off.
Switch off the battery master switch.
5.3 Driving the truck crane and switching it off
Transport at the rear of the carrier
Push the chock (2) behind the bracket (3) and
hang it on the holder (1).
(A) – Folding out
Push the latch (4) through the hole (5).
The chock unfolds by spring force.
(B) – Folding up
Push the chock together until the latch (4)
engages in the hole (5).
3 112 xxx en
Driving
s
5 - 55

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF