Manitowoc Grove GMK6300L Operating Manual page 849

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

Rigging for crane
operation
Operating Manual GMK6300L
Slacken the hoist rope and derrick the main
boom simultaneously.
Raise the main boom until the boom head
is in a vertical position above the block
hook (1).
Detach the block hook from the retaining
ropes (2).
(A) – Pull the pin (3) out.
(B) – Raise the hook block (1) above the
hook (2 until the connecting points are
aligned.
Insert the pins (3) and secure them with the
retaining pins.
3 112 xxx en
Rigging work
12.8 Rigging work on the main boom
12 - 91

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF