Driving modes
6.6 Installing/removing the supporting box
6.6.1
H
6 - 66

CHECKLIST: Removing the supporting box

This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions specified there!
1. Rig the outrigger span 7.98 x 8.50/1.00 m (26.1 x 27.9/3.3 ft) and align
the truck crane horizontally;
2. Disconnect the pneumatic connections between the carrier and sup-
à
porting box;
3. Install the reverse camera to the carrier;
4. With the RCL set accordingly, raise the main boom and slew the super-
structure to the rear;
à
Crane movements during installation and removal , p. 6 - 81.
5. Sling the supporting box to the truck crane;
supporting box , p. 6 - 82.
à
p. 6 - 71.
p. 6 - 74.
3 112 xxx en
à
p. 6 - 80.
à
Slinging points on the
Operating Manual GMK6300L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF