Establishing The Hydraulic Circuits Required - Manitowoc Grove GMK6300L Operating Manual

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

14.6.4
Switching over
valves
G
Operating Manual GMK6300L

Establishing the hydraulic circuits required

To establish an hydraulic circuit, switch over the required valves and possi-
bly also perform additional switching operations for lifting/lowering or
slewing.
The valves 1 to 5 are numbered.
Danger from mutual interference of the power units!
For crane operation, always switch all the valves 1 to 5 down. This prevents
the power units suddenly starting to move.
For crane operation
Switch the valves 1 to 5 downward.
3 112 xxx en
Malfunctions during crane operation
14.6 Hydraulic emergency operation
s
14 - 69

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF