Manitowoc Grove GMK6300L Operating Manual page 748

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

Crane operation
11.7 Heating and air-conditioning system
Preheating the
crane cab
H
11 - 136
If the crane cab is to be preheated in addition to the engine, adjust the
heating system as follows:
The amount of time required to preheat the engine will be increased
significantly by simultaneously heating the crane cab.
Switch (1) to position Warm .
Switch (3) to the Recirculated air symbol.
Switch (2) to the required fan level.
Open the air vents;
3 112 xxx en
à
p. 11 - 132
Operating Manual GMK6300L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF