Operating elements for crane operation
9.1 Overview of the operating elements
9.1.3
9 - 8
Front panel
1 Emergency stop switch
2 Control unit RCL (Rated-Capacity-Limiter)
Depending on the version:
3
– RCL override – symbol (A)
or
– RCL override – symbol (A)
– for RCL
– Lifting limit switch
4 ECOS control unit
5 Front control panel
3 112 xxx en
à
p. 9 - 65
à
p. 9 - 40
à
p. 11 - 44
à
p. 11 - 45
à
p. 9 - 20
à
p. 11 - 8
Operating Manual GMK6300L