Preparing The Truck Crane - Manitowoc Grove GMK6300L Operating Manual

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

12.6.4
In the driver's cab
Outriggers control
units
Operating Manual GMK6300L

Preparing the truck crane

Levelling the truck crane
Align the truck crane horizontally with the level adjustment system;
à
Operating the level adjustment system , p. 5 - 64.
Locking the suspension
Switch off the suspension;
The operating elements for the outriggers are only released if the suspen-
sion is switched off. If the suspension is switched off, the wheels are lifted
when the crane is put on outriggers.
You can switch the Outrigger control units on and off from the crane cab.
In the main menu press button (1) once.
This opens the Settings submenu.
à
p. 5 - 17.
The current status is displayed:
– Symbol (2) – operating units on, buttons
enabled,
– Symbol (3) – operating units off, buttons
disabled.
To switch on or off, press the button next to
the symbol (1) once.
3 112 xxx en
Rigging work
12.6 Outriggers
12 - 31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF