Manitowoc Grove GMK6300L Operating Manual page 766

Hide thumbs Also See for Grove GMK6300L:
Table of Contents

Advertisement

Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 8
11. – Fold in the mirrors for crane operation;
– Lower the slewable spotlights;
12. Retracting the outriggers;
p. 12 - 29.
13. Activate the suspension (release locking).
The symbol (1) must be green (suspension on);
14. Turn off the engine and, if necessary, remove the hand-held control and
stow it away in the driver's cab;
p. 12 - 21.
15. If there is no further work for the truck crane;
more than 8 hours , p. 11 - 130.
à
à
CHECKLIST: Retracting the outriggers ,
à
Removing the hand-held control ,
3 112 xxx en
à
p. 12 - 123,
p. 11 - 108
à
p. 5 - 18.
à
In case of work breaks of
Operating Manual GMK6300L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF