Checks before operating the crane

Crane operation is only enabled when the Monitoring submenu is open.
After a standstill of less than 48 hours and after accepting a rigging mode,
the Monitoring submenu will open automatically.
You can also open the submenu manually.
If necessary, open the main menu
The Monitoring submenu opens.
You can only quit the RCL monitoring submenu when all crane movements
have stopped – control lever in zero position.
11.2 Operation of the rated capacity limiter
ö
and press the button (1) once.
3 112 xxx en
Crane operation
s
11 - 31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK6300L and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Grove gmk6300l-1

Table of Contents

Save PDF