Mitsubishi MOTORS Space Runner 1999 Workshop Manual Supplement page 352

Hide thumbs Also See for Space Runner 1999:
Table of Contents

Advertisement

MB991453
ENGINE <4G1> –
INSTALLATION SERVICE POINTS
AA ENGINE ASSEMBLY INSTALLATION
Install the engine assembly, checking that the cables, hoses,
and harness connectors are not clamped.
BA ENGINE MOUNT BRACKET INSTALLATION
MZ203827
1. Place a garage jack against the engine oil pan with a
2. Support the engine with the garage jack.
3. Remove the chain block and support the engine assembly
CA FUEL HIGH PRESSURE HOSE INSTALLATION
1. Apply a small amount of new engine oil to the O-ring.
2. While turning the fuel high-pressure hose to the right and
3. If the hose does not turn smoothly, the O-ring is probably
Engine Assembly
piece of wood in between, and install the engine mount
bracket while adjusting the position of the engine.
with the special tools.
Caution
Do not let any engine oil get into the delivery pipe.
left, install the delivery pipe, while being careful not to
damage the O-ring. After installing, check that the hose
turns smoothly.
being clamped. Disconnect the fuel high-pressure hose
and check the O-ring for damage. After this, re-insert the
delivery pipe and check that the hose turns smoothly.
11B-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents