Engine Assembly - Mitsubishi MOTORS Space Runner 1999 Workshop Manual Supplement

Hide thumbs Also See for Space Runner 1999:
Table of Contents

Advertisement

11B-28

ENGINE ASSEMBLY

REMOVAL AND INSTALLATION
Caution*:
Indicates parts which should be temporarily tightened, and then fully tightened with the
vehicle on the ground in the unladen condition.
Pre-removal Operations
D
Fuel Line Pressure Releasing
(Refer to GROUP 13B – On-vehicle Service.)
D
Hood Removal (Refer to GROUP 42.)
D
Radiator Assembly Removal (Refer to GROUP 14.)
D
Under Cover Panel Removal
D
Air Cleaner Removal
D
Front Exhaust Pipe Removal (Refer to GROUP
15.)
4.9 Nm
8.8 Nm
18
3
19
2
14
13
17
Removal steps
1. Accelerator cable connection
2. Vacuum hoses connection
3. Boost sensor and bracket assembly
4. Brake booster vacuum hose
connection
5. Detonation sensor connector
6. Injector connector
7. Intake air temperature sensor connector
8. Purge control solenoid valve connector
9. EGR solenoid valve connector
10. Distributor connector
ENGINE <4G1> –
9.8 Nm
1
10
15
9
8
7
4
Engine Assembly
Post-installation Operations
D
Front Exhaust Pipe Installation (Refer to GROUP
15.)
D
Radiator Assembly Installation
(Refer to GROUP 14.)
D
Air Cleaner Installation
D
Accelerator Cable Adjustment
(Refer to GROUP 17 – On-vehicle Service.)
D
Drive Belt Tension Adjustment (Refer to P.11B-5.)
D
Hood Installation (Refer to GROUP 42.)
D
Under Cover Panel Installation
15
18
11
12
Engine Oil
6
5
16
11. Engine coolant temperature sensor connec-
tor
12. Engine coolant temperature gauge unit con-
nector
13. TPS connector
14. Idle speed control servo connector
15. Control wiring harness clamp connection
16. Earth cable connection
17. Heater hoses connection
CA
18. High–pressure fuel hose connection
19. Fuel return hose connection
11200100763
O–ring
Delivery pipe
16
9.8 – 12 Nm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents