11A-34
ENGINE ASSEMBLY
REMOVAL AND INSTALLATION
Caution
Mounting locations marked by * should be provisionally tightened, and then fully tightened when
the body is supporting the full weight of the engine.
Pre-removal and Post-installation Operation
D
Prevention of Fuel Discharge <before removal only>
(Refer to GROUP 13A – On-vehicle Service.)
D
Engine Coolant Draining and Supplying
(Refer to GROUP 14 – On-vehicle Service.)
10
O-ring
Engine oil
Removal steps
1. Ignition coil connector
2. Cam position sensor connector
3. Engine coolant temperature sensor
connector
4. Engine coolant temperature gauge
unit connector
5. Detonation sensor connector
6. Purge solenoid valve connector
7. Fuel pressure sensor connector
ENGINE <4G9> –
2
7
3
4
12
5
8.8 Nm
10
Engine Assembly
D
Hood Removal and Installation (Refer to GROUP 42.)
D
Drive Belt Tension adjustment <after installation only>
(Refer to P.11A-7.)
1
6
11
8. Throttle valve control servo connec-
tor
9. Throttle position sensor connector
CA 10. High-pressure fuel hose connection
11. Fuel return hose connection
12. Vacuum hose connection
13. Brake booster vacuum hose con-
nection
8
13
9